Cabover construction question 2001 Minnie 22R
Help! I have a 2001 WF322R that I'm doing a total cabover rebild on. The problem is the sleeper board and everything past the metal bonding strip was complete mush and fell out when disassembled.
I get that on the strip, first row of screws go into the sleeper board, second into the lower strip. But what does the third row go into?
I have in the heap, a foot wide strip of bead board and two 3 inch strips of wood. Have no idea what order the bead board and wood goes. Hope someone has a little more information on how it was constructed past the metal bonding strip.
|